Explore DALI's three existing Cambodia factories for garments and socks, plus a new campus in trial production, not yet in full operation, in the Phnom Penh SEZ.
For private-label underwear and other bulk garment programs, DALI connects Chinese fabric and elastic development with its Cambodia manufacturing network. Three existing factories cover garments and socks; an additional campus is in trial production, not yet fully operational. Review your design, quantity and destination with the team to agree the proposed factory, material route and production window.
Garment production floor, Cambodia Factory I
Existing factory
Factory I
Garment manufacturing
Production lines
35
Employees
980
Factory area
9,096 m²
Operations and product review
The first factory connects garment production with cutting preparation, inspection and packing. Approved samples, fabric specifications and buyer instructions guide the proposed bulk order.
Cutting preparation
Garment production
Inspection and packing
Garment workshop, Cambodia Factory II
Existing factory
Factory II
Garment manufacturing
Production lines
45
Employees
1,200
Factory area
9,500 m²
Operations and product review
The second factory provides another garment production operation within DALI's Cambodia network. Sewing, in-process review and finishing requirements are coordinated for the product and production specification.
Garment sewing
In-process review
Finishing and packing
Production workshop, Cambodia Factory III
Existing factory
Factory III
Sock manufacturing
Sock knitting machines
700
Employees
520
Factory area
8,000 m²
Operations and product review
The third factory adds sock manufacturing to the Cambodia network. The project brief identifies yarn, construction, knitted artwork, sizing, finishing and pair-pack requirements for the proposed assortment.
Sock production
Finishing and inspection
Pair-pack requirements
DALI's annual capacity of 180 million pieces is a group-wide figure covering China and Cambodia together. The factories below form part of that network.
Trial production · Construction ongoing
New Cambodia production campus
DALI's new production campus in the Phnom Penh Special Economic Zone is in trial production. Construction and fit-out are continuing; the campus is not yet in full operation. The development plan includes garment and sock capacity, solar generation and energy storage; these targets are separate from current group capacity.
Current status confirmed on 24 October 2026: trial production is underway, with construction and fit-out continuing.
New Cambodia campus exterior. Trial production is underway; construction and fit-out are continuing.New Cambodia campus workshop during trial production. The campus is not yet in full operation; construction and fit-out are continuing.
New-campus specifications
Site area
36,000 m²
Building area
30,000 m²
Planned garment lines
30
Planned sock machines
1,000
Planned employees
2,000+
Original expansion plan
Q2 2026Main structure completion
Q3 2026Trial production
Q1 2027Full operation
LABS (Life and Building Safety) program target: Q1 2027. The planned scope covers fire safety, structural integrity and emergency systems.
New-campus target capacity
Garments
6.0M pieces / month
Socks
4.0M pairs / month
30M+ pieces group monthly capacity after expansion (target).
Factory audits and product documentation apply to the named facility and scope. Review the documentation portfolio and ask for the records relevant to the proposed production site.
ERP-supported tracking connects material readiness, production status and inspection information. A designated contact coordinates factory questions and progress reporting, including weekly reports for the agreed program. Open changes are reviewed with their effect on the specification and schedule so your buying team can see what needs a decision.
People and process capability
DALI's training center supports personnel development and continuous improvement. Technical requirements, sample comments and inspection findings are connected to the work performed by production teams. This gives the approved specification a practical role on the production floor rather than leaving it only in the development correspondence.
01Which Cambodia factories are part of DALI's existing network?
Factory I and Factory II manufacture garments; Factory III manufactures socks. The Cambodia network was established in 2015.
02What is the new Cambodia campus expansion schedule?
The original expansion schedule targeted main-structure completion in Q2 2026, trial production in Q3 2026 and full operation in Q1 2027. As confirmed on 19 October 2026, trial production has begun and the campus is not yet in full operation. Target capacity is 6.0 million garment pieces and 4.0 million pairs of socks per month, not current operating output.